Foundation for Ageing & Inclusive Development (FAID)
Request for Quotation - Solar Power System
363 views
Posted date 28th September, 2025 Last date to apply 3rd October, 2025
Country Pakistan Locations Nowshera, Khyber Pukhtunkhwa
Category Installation, Facilities, Maintenance, and Repair
Type Contractual Position 1

                                                            Terms of Reference (TOR)

              For the Supply, Installation, Testing & Commissioning of a 3 kW Solar Power System

Location: Nowshera Office


1. Background

The Nowshera Office intends to install a 3 kW solar photovoltaic (PV) system to ensure uninterrupted and sustainable power supply. The system will utilize high-efficiency solar panels, a hybrid inverter, lithium battery storage, and appropriate mounting and protection equipment.


2. Objectives

  • To supply, install, and commission a complete 3 kW solar PV system in line with the provided specifications.
  • To ensure the system delivers reliable, renewable, and cost-effective power for office operations.
  • Must support 1AC (1.5 invertor), Water Dispenser, 4 LED Bulb and 2 Fans

3. Scope of Work

The Contractor shall be responsible for:

3.1 Supply of Equipment

  • Solar Panels: 6 panels , optimized for a 3 kW system output).
  • Mounting Structure: L2 14-gauge steel frame (4 units), weather-resistant and compatible with site conditions.
  • Inverter: Itel 4 Pro KW hybrid inverter (1 unit).
  • Battery Backup: Itel Lithium Power Bank (1 unit).
  • Miscellaneous Materials: High-quality wiring, breakers, and protection devices.

3.2 Installation

  • Secure mounting of solar panels on suitable structure (roof or ground).
  • Electrical connections between panels, inverter, batteries, and load center.
  • Installation of all protective devices and breakers.
  • Ensuring compliance with national electrical safety standards.

3.3 Testing and Commissioning

  • Performance testing under load conditions.
  • Calibration and configuration of inverter settings.
  • Battery charge/discharge cycle testing.
  • System handover to the client with a commissioning report.

4. Deliverables

  • Fully installed and operational 3 kW solar PV system.
  • User manual and warranty documents for all supplied equipment.
  • System design layout (single-line diagram).
  • Training session for operation and maintenance.

5. Timeline

  • Project commencement: Within 5 working days of contract signing.
  • Installation and commissioning completion: Within 10 working days from commencement.

6. Roles and Responsibilities

Contractor: Supply, deliver, install, and test the complete system; provide training and documentation.
Client: Provide site access, confirm installation location, and facilitate necessary permits if required.


7. Warranty and Support

  • Minimum 5-year warranty on solar panels.
  • Minimum 2-year warranty on inverter and battery.
  • Free maintenance support for the first 6 months post-installation.

8. Payment Terms

As per the agreed contract, linked to delivery and commissioning milestones.


 

 

Apply By:

sealed quotation shall be submitted at the below mentioned address

Foundation for Ageing & Inclusive Development- FAID

Offiec 6, Ground Floor, Shah Tower, Sector E/11/2, Islamabad

Contact: 051 8736476 / 0334 7707744

Search